Societe du developpement economique de Greenstone - Greenstone Economic Development Corporation

The Greenstone Economic Development Corporation (GEDC) fosters and encourages the start-up and operation of successful enterprise in all economic sectors within the Greenstone Region. We are a community-based, non-profit organization administered by a volunteer board of directors representative of the communities within the Greenstone Service area.

Latest News

GEDC Unveils New Look and Stra
GEDC Unveils New Look and Strategic Plan Megan Wilson Throughout ...
GEDC Open House
GEDC Open House Small business week is underway and on Friday October ...
Greenstone Takes the Lead in E
Greenstone Takes the Lead in Excellence In June 2011, the Municipality ...
Create Customer WOW
CREATE CUSTOMER WOW FOR YOUR SMALL BUSINESS CREATE CUSTOMER WOW FOR ...
Industry CanadaFedNor
Community Futures Development Corporations in Ontario

Orphan-Dikdik-Mantis Mine

 

Commodity/Produit de base :

Gold/Or (Au)

Operation/En opération :

 1934-1935

Ore mined/Minerai exploité :

 3,525 tons

Gold produced/Or produit :

 2,460 oz.

Recovered grade/Qualité recouverte :

 0.70 OPT**

** OPT = Ounces per ton
 

 

image  View Mine locations in Google Earth™ (.kmz)/Voir le lieu de la mine dans Google EarthTM (.kmz)

( Download/install Google Earth™ - its free!Téléchargez/installer Google Earth TM – c’est gratuit!)

  

History/Historique

The Orphan Mine was also known as the Dikdik and the Mantis Mine.  It was first discovered by Tom Johnson in 1931.  By 1933 surface work was underway, with a shaft sunk to 160 feet.  By 1934 the shaft was at 262 feet, with levels at 150 and 250 feet, respectively.

The mine operated from 1934 to 1935, producing 2,460 ounces of gold and 1,558 ounces of silver. This mine had one of the highest production grades in the Beardmore-Geraldton area, averaging 0.70 ounces of ore per tonne milled.

 

La mine Orphan était aussi connue sous les noms de Dikdik et de Mantis. Elle a premièrement été découverte par Tom Johnson en 1931. En 1933, les travaux en surface étaient commencés avec un puits creusé à 160 pieds. En 1934, le puits était à 262 pieds avec des niveaux à 150 et 250 pieds respectivement.

La mine était en fonction de 1934 à 1935, produisant 2 460 onces d’or et 1 558 onces d’argent. Cette mine avait une des plus hautes qualités de production de la région de Beardmore-Geraldton avec une moyenne de 0,70 once d’or par tonne broyée.