Societe du developpement economique de Greenstone - Greenstone Economic Development Corporation

The Greenstone Economic Development Corporation (GEDC) fosters and encourages the start-up and operation of successful enterprise in all economic sectors within the Greenstone Region. We are a community-based, non-profit organization administered by a volunteer board of directors representative of the communities within the Greenstone Service area.

Latest News

GEDC Unveils New Look and Stra
GEDC Unveils New Look and Strategic Plan Megan Wilson Throughout ...
GEDC Open House
GEDC Open House Small business week is underway and on Friday October ...
Greenstone Takes the Lead in E
Greenstone Takes the Lead in Excellence In June 2011, the Municipality ...
Create Customer WOW
CREATE CUSTOMER WOW FOR YOUR SMALL BUSINESS CREATE CUSTOMER WOW FOR ...
Industry CanadaFedNor
Community Futures Development Corporations in Ontario

Hard Rock Mine

 

Commodity/Produit de base :

Gold/Or (Au)

Operation/En opération :

1938-1951

Ore mined/Minerai exploité :

1,458,375 tonnes

Gold produced/Or produit :

269,081 oz

Recovered grade/Qualité recouverte :

0.18 OPT**

Status/Statut:

Exploration for re-opening/Exploration pour réouverture

** OPT = Ounces per ton

 

image View Mine locations in Google Earth™ (.kmz)/Voir le lieu de la mine dans Google EarthTM (.kmz)

( Download/install Google Earth™ - its free!/Téléchargez/installer Google Earth TM – c’est gratuit!)


 

History/Historique

Hardrock Mine was first discovered in 1931 by “Hardrock” Bill Smith and Stan Watson on Discovery Point of Kenogamisis Lake .  A village grew up at Hard Rock in 1934.  Shaft sinking began in 1935, and Hard Rock Gold Mines, Ltd., became the third producing gold mine in the Little Long Lac gold camp by January, 1938.

imageTwo shafts were sunk between 1934 and 1951; No. 1 to 475 feet, No.2 to 1,410 feet; connected to each other at 475-foot level. A cianide mill, capacity 200 tons per day was installed, capacity was later increased to 500 tons per day. In total the Hard Rock Mine produced 269,081 ounces of gold and 9,009 ounces of silver.  The mine began operating in January 1938, and tonnage rose each year until it peaked in 1942. As with other mines, the war years meant difficulty in keeping miners.

The Hard Rock Mine closed in 1951 after having given up 269,081 ounces at an average grade of 0.18 OPT.  When the enterprise closed, Mosher Longlac purchased the plant and equipment. 

 

La mine Hardrock a premièrement été découverte en 1931 par «Hardrock» Bill Smith et Stan Watson sur «Discovery Point» du lac Kenogamisis. En 1934 un village a été créé à Hard Rock. Le creusage du puits débuta en 1935, et Hard Rock Gold Mines Ltd., est devenu la troisième mine produisant de l’or dans le camp d’or de Little Long Lac par janvier 1938.

Deux puits ont été creusés entre 1934 et 1951; le no. 1 jusqu’à 475 pieds; no. 2 jusqu’à 1 410 pieds; ils étaient connectés au niveau de 475 pieds. Une usine à cyanure à capacité de 200 tonnes par jour a été installée et a été, par la suite, augmentée à 500 tonnes par jour. Au total, la mine Hard Rock a produit 269 081 onces d’or et 9 009 onces d’argent. La mine a commencé à être en service en janvier 1938 et le tonnage n’a cessé d’augmenter chaque année jusqu’à son maximum en 1942. Comme dans les autres mines, garder des mineurs était difficile pendant la guerre.

La mine Hard Rock a fermé en 1951 après avoir donné 269 081 onces d’or d’une qualité moyenne de 0,18 OPT. Lorsque l’entreprise a fermé, Mosher Longlac a acheté les installations et l’équipement.

 

Current operations/Opérations courantes

Currently Premier Gold mines is drilling the property to identify additional gold resources.

 

 

Présentement, Premier Gold Mines fore la propriété pour identifier d’autres sources d’or.